top of page
Pukekohe Rail Bridge Removal & Relocation.
Rigging for Pollock Cranes to remove an existing walkway bridge over a live railway line. The Grove GMK6300L, 2No JLG660 boom lifts, 1No operational lift supervisor, 2No rigger/dogman and heavy lift rigging equipment was used.
​
Photo Credit - Pollock Cranes
bottom of page