top of page

Pukekohe Rail Bridge Removal & Relocation.

Rigging for Pollock Cranes to remove an existing walkway bridge over a live railway line. The Grove GMK6300L, 2No JLG660 boom lifts, 1No operational lift supervisor, 2No rigger/dogman and heavy lift rigging equipment was used.

​

Photo Credit - Pollock Cranes

Screenshot 2023-03-30 104408.jpg
Screenshot 2023-03-30 104451.jpg
Screenshot 2023-03-30 104305.jpg
bottom of page